• English
  • 中文
  • Français
  • Deutsch
  • Español
Contact Us
Home
Email
Follow Prosoft Technology on Twitter
Follow Prosoft Technology on Facebook
Follow Prosoft Technology on LinkedIn
Follow Prosoft Technology on YouTube
    • PROFINET Controller Module for ControlLogix®
    • EtherNet/IP™ to DH+ Gateway
    • Two-Port Building Automation Gateway
  • Solutions
    • Amusement
    • Automated Material Handling
    • Automotive
    • IIoT Solutions
    • Mining and Metals
    • Modernization
    • Oil and Gas Solutions
    • Secure Remote Connectivity
    • Water & Wastewater
  • Productos
    • Acceso remoto
    • Rockwell Automation
    • Gateways
    • Conectividad Inalámbrica
    • ProSoft Software
  • SERVICIOS Y SOPORTE
    • Knowledge Base
    • Soporte técnico regional
    • Descargas
    • Capacitación
    • Return Material Instructions
    • Solicitud de documentación
  • NOVEDADES Y EVENTOS
    • ProSoft Insights (Blog)
    • Podcast
    • Historias de éxito
    • Comunicados de prensa
    • Revista ProSoft
    • Eventos
  • Cómo comprar
    • Distribuidor
  • LA EMPRESA
    • Contáctenos
    • Perfil Corporativo
    • Quality & Environment
    • Reconocimiento de la industria
    • Empleo
    • Afiliaciones
Featured Products
  • PROFINET Controller Module for ControlLogix®
  • EtherNet/IP™ to DH+ Gateway
  • Two-Port Building Automation Gateway
Featured Products  >  Two-Port Building Automation Gateway
Knowledge Base

Two-Port Building Automation Gateway

Categories

  • Gateways
  • Rockwell In-chassis
  • Schneider In-chassis
  • Wireless
  • Accessories
  • Protocols
  • Software
  • Legacy Products
  • Certifications
  • Technical Support
  • Miscellaneous

What do you need help with?

Why am I unable to communicate with Wonderware from a 4xxx or 5xxx Series gateway in a full Duplex DF1 configuration

The Wonderware driver ABKF2 does not process or use the station ID when operating in Full Duplex mode.  The DF1 full duplex specification requires a station id when more than one device is present

Read more

In the MVI56-BAS how can I transfer a string to the CLX Processor?

is transferred to the processor for i=1 to l step 2 rem all the ASCII chars are extracted value = asc($(0),i) + asc($(0),i+1) * 256 push value push int(i/2) + 202 cal l25 rem and transferred

Read more

Where are the on-board jumper positions defined for my MVI module?

On bottom of the circuit board for any MVI products, you' ll find three jumper banks: COM1, COM2, and Setup. Each jumper position is labeled 232, 422 and 485.

Read more

How many weatherproofing kits do I need for my radios?

Weatherproof, RLX, RLX2, RadioLinx, Wireless, Accessories, Kit, Radio,

Read more

My 3150-MCM block IDs are incrementing until I connect the communications cable. Once the cable is connected, the block ID stops incrementing.

Verify the cable matches the diagram on page 50 of the user manual. If pins 7 and 8 are not jumpered, and there is communications on pins 1 or 9, your backplane transfers will fail. The error status

Read more
  • «
  • 21
  • 22
  • 23
  • 24
  • 25
  • »

Solutions

  • Amusement
  • Automated Material Handling
  • Automotive
  • IIoT Solutions
  • Mining and Metals
  • Modernization
  • Oil and Gas Solutions
  • Secure Remote Connectivity
  • Water & Wastewater

Productos

  • Acceso remoto
  • Rockwell Automation
  • Gateways
  • Conectividad Inalámbrica
  • ProSoft Software

SERVICIOS Y SOPORTE

  • Knowledge Base
  • Soporte técnico regional
  • Descargas
  • Capacitación
  • Return Material Instructions
  • Solicitud de documentación

NOVEDADES Y EVENTOS

  • ProSoft Insights (Blog)
  • Podcast
  • Historias de éxito
  • Comunicados de prensa
  • Revista ProSoft
  • Eventos

Cómo comprar

  • Distribuidor

LA EMPRESA

  • Contáctenos
  • Perfil Corporativo
  • Quality & Environment
  • Reconocimiento de la industria
  • Empleo
  • Afiliaciones
© Copyright 2025 ProSoft Technology, Inc.
SITE MAP | MAGAZINE | CONTACT US | LEGAL STATEMENTS | PRIVACY POLICY | COOKIE POLICY | Cookie Settings